group pictureThe Third meeting of the Expert Team on Wind Waves and Storm Surges was held in Toronto, Canada. The Team reviewed the work that has been done since JCOMM-III (November 2009, Morocco), identifying follow-up actions, and updated the intersessional workplan. Main outcome of this meeting include the following:

  • The operational wave forecast verification project would continue with extended application of the ECMWF web products.
  • The Team will continue to work with ETMC in establishing the template for extreme wave data base, and provide feedback to the US National Ocean Data Center (NODC) which will host the database. The Team will also seek participation of Oil and Gas Producers Met Ocean Committee, and coordination with the GLOBWAVE.
  • The Team discussed on the follow-up to recommendations at JCOMM Symposium on Storm Surges (2007, Seoul), including storm surge climatology. On this particular issue, the definition and requirements should be further developed, possibly until MARCDAT-III workshop in early 2011.
  • The Team will continue to lead the WMO Coastal Inundation and Forecasting Demonstration Project (CIFDP), by Val Swailand Don Resio, and support the implementation of WMO Storm Surge Watch Scheme.
  • The Team will continue to provide advice to the UNESCO pilot project for Enhancing regional capabilities for Coastal Hazards Forecasting and Data Portal Systems, led by Kevin Horsburgh and involvement of other Team members. The Team will also continue provide input to the planning of ESA Storm Surge Project (eSurge).
  • The Team initiated work to update the Guide to Wave Analysis and Forecasting (WMO No.72). A table of contents will be completed by the end of September 2010. The Guide to Storm Surge Forecasting will be published after final review by the Team.
  • The Team reviewed wave measurement related sections of Part II, Chapter 4, Marine Observations, of the WMO Guide to Meteorological Instruments and Methods of Observation (WMO No. 8). The proposed changes have been submitted and included in the version submitted to CIMO for approval. The meeting also reviewed requirements for the encoding of wave information in BUFR, and discussed the proposals by the DMPA Task Team on Table Driven Codes in this regard.
  • The Team discussed on two Pilot Projects on wave observations, PP-WET and PP-WMD. Further input from the Team were delivered to the project steering committees.
  • Following the request at JCOMM-III, the Team worked with ETMSS to develop proposals for inclusion of information on complex sea states in weather and sea bulletins, and subsequently for amendment WMO Manuals No. 558 and 471.

Notes

no event notes available

Report
Code Name Updated on Action
JCOMM-MR-080, SPA_ETWS_report_ETWS3_Final Final Report, Third Session of the Expert Team on Wind Waves and Storm Surges 11/04/2013
Agenda Documents
Agenda Code Name Updated on Action
Agenda Code Name Updated on Action
1.3 ETWS-3 Doc. 1.3 ETWS-3 Timetable 14/05/10
2.1 ETWS-3 Doc 2.1 ETWS-3 SFSPA-Rpt 14/05/10
2.2 ETWS-3 Doc. 2.2 Report of the Chairperson 12/05/10
3.4 ETWS-3 Doc.3.4 Coastal Inundation Forecasting Demonstration Project 12/05/10
5.2 ETWS-3 Doc .5.2 WMO Rolling Review of Requirements 12/05/10
5.3.1 ETWS-3 Doc. 5.3.1 Wave Measurement Issues 12/05/10
5.3.1(1) ETWS-3 Doc. 5.3.1(1) Wave Measurement Issues (2) 12/05/10
5.3.2 ETWS-3 Doc-5.3.2 WMO Publication No. 8 (CIMO-Guide) 12/05/10
7.2 ETWS-3 Doc.7.2 Joint Activities of the JCOMM Expert Team on Wind Waves and Storm Surges (ETWS) and the Expert Team on Marine Climatology (ETMC) 12/05/10
8.2 ETWS-3 Doc. 8.2 Disaster Risk Reduction Programme-Progress/Activity Report 12/05/10
9.1 ETWS-3 Doc. 9.1 Terms of Reference - Expert Team on Wind Waves and Storm Surges 12/05/10
Background Documents
Agenda Code Name Updated on Action
Agenda Code Name Updated on Action
SFSPA Projects 12/05/2010
Other Documents
Code Name Updated on Action
Code Name Updated on Action
SPA_ETWS_ETWS3_01 logistics information for ETWS-III 16/04/2010
19
Invited
18
Confirmed
1
Provisional
0
Unapproved
0
Declined
0
Rejected
Members
15
Name Country
BIDLOT Jean-Raymond United Kingdom of Great Britain and Northern Ireland
BRUNS Thomas Germany
DE VRIES Hans Netherlands (Kingdom of the)
ENTEL Mikhail Australia
ETALA María Paula Argentina
GORMAN Richard New Zealand
GREENSLADE Diana Australia
HORSBURGH Kevin United Kingdom of Great Britain and Northern Ireland
KOHNO Nadao Japan
LEFÈVRE Jean-Michel France
RESIO Donald United States of America
SAULTER Andy United Kingdom of Great Britain and Northern Ireland
SWAIL Val Canada
TOLMAN Hendrik L. United States of America
YOU Sung Hyup Republic of Korea
Invited Experts
2
Name Country
JI Ming United States of America
SWAIL Kerri Canada
Secretariats
2
Name Country
CABRERA Edgard Switzerland
LEE Boram Switzerland
Status Legend
Confirmed & Approved
Need Confirmation
Need Approval
Declined
Rejected
Group(s): JCOMM.
Label(s): no labels
Created at 03:30 on 26 Feb 2010 by Boram Lee
Last Updated at 11:20 on 18 Nov 2010 by Sungmin O
Loading…
Loading the web debug toolbar…
Attempt #